Our custom design team carefully integrated state-of-the-art systems into this century old building. Strategically working around layers of earlier construction, we installed a full QSC PreSonus sound system and a 6 K projector with Pro Presenter for media presentation.
For this full audio and lighting renovation, Mark AVL supplied and installed state-of-the- art QSC sound equipment, quality microphones, and full environmental LED lights. The finished effect drastically improved the worship environment for UPC.
Our team retired a 25-year-old, well-used public address system and installed a Left Center Right Main system with a Left-Right Rear Delay. Working one-on-one, we synced the worship team with the system, and trained the tech team to operate their new equipment at full potential.
We partnered with Aboite Baptist Church to upgrade their sanctuary for broadcast video. This project included the installation of high output RGB LED light fixtures, a professional lighting control console, and DMX lighting control cable.
To update lighting, we reprogrammed the existing architectural lighting system, installed a DMX Cable Network, and added down lighting to the back wall as well as up lighting to the stage floor. A new digital mixer, and stage box with personal monitor mixers for the worship team added dynamic quality to the sound.
We were called in to clean up stage clutter and renovate a 50 year old mic cable installation on the stage. Our solution was to install 5 new stage boxes with XLR in’s and out’s as well as A/C power outlets. Additionally we installed lighting dimmers to give Grace Bible more control of architectural lighting.
There has never been a better time to start a new project.